PSEG Long Island, as agent of and in collaboration with LIPA, is developing the 2027 Integrated Resource Plan (2027 IRP) for the LIPA electrical grid powering Long Island and the Rockaways. A presentation on the grid’s energy needs and a draft scope of work for the 2027 IRP was presented by LIPA and PSEG Long Island staff to the LIPA Board of Trustees on Wednesday, May 20th, 2026. 

For more information on the 2027 IRP, project updates, and public comment information, please visit the dedicated IRP website at LIResourceplan.com

Information on the 2023 and 2017 IRPs can be found here