City of Long Beach
Power On Projects
East Atlantic Beach and the City of Long Beach
Start Date: October 2020
Posted Date: October 7, 2010
The route will cover approximately 1.15 miles along an electric main line circuit. PSEG Long Island crews will be working on the following streets:
Beech Street between Mark Lane and Malone Avenue
Clayton Avenue north of Beech Street
Park Street between Malone Avenue and Nevada Avenue
W Park Avenue between Nevada Avenue and California Street
City of Long Beach
Start date: November 2020
Posted date: October 27, 2020
The route will cover approximately 2.28 miles along an electric main line circuit. Long Island crews will be working on the following streets:
W Broadway between Lafayette Boulevard and Edwards Boulevard
E Broadway between Edwards Boulevard and Riverside Boulevard
Magnolia Boulevard between W Broadway and W Beech Street
Rear Property of W Penn Street between Magnolia Boulevard and Edwards Boulevard
Edwards Boulevard between W Walnut Street to just south of W Broadway
Riverside Boulevard between E Park Street and E Pine Street
Riverside Boulevard between W Penn Street and Shore Road
Shore Road between Riverside Boulevard and Franklin Boulevard
Lido Beach and the City of Long Beach
Start Date: February 2019
Crews will be working on 1 miles of an electric main line circuit on the following streets:
East Park Avenue between Franklin Boulevard and Maple Boulevard
East Chester Street between Franklin Boulevard and Roosevelt Boulevard
East Walnut Street between Roosevelt Boulevard and Maple Boulevard
In addition, switching equipment will be installed or replaced at Roosevelt Boulevard between East Park Avenue and East Chester Street, Maple Boulevard between East Walnut Street and Redan Road and Lido Boulevard between Fairway Road and Blackheath Road.