Town of North Hempstead

FEMA Electric Circuit Improvement Projects

We're upgrading key electric circuits in your neighborhood to improve reliability of the electric grid.


Villages of Kings Point and Great Neck 
Start date: September 2019
Posted date: September 20, 2019

PSEG Long Island crews will be working on the following streets:
Harbour Road between East Shore Road (eastern intersection) and 19 Harbour Road
Rear Property between 19 Harbour Road and 7 Harbour Road
Rear Property between 526 East Shore Road and 530 East Shore Road
East Shore Road between 530 East Shore Road and Ravine Road

Crews will move the main line wires underground along the following streets: Spring Lane between Rogers Road and Henhawk Road, Henhawk Road between Spring Lane and Remsen Road, Remsen Road between Henhawk Road and East Shore Road and East Shore Road from Remsen Road to 429 East Shore Road. In addition, switching equipment will be installed at East Shore Road north of Cow Lane.


Great Neck Gardens, Villages of Kings Point, Great Neck, and Thomaston
The route will cover approximately 2.5 miles along an electric main line circuit.
Start date: July 2018

PSEG Long Island crews will be working on the following streets:
Gilchrest Road between Grace Avenue and Nassau Drive
Station Road between Gilchrest Road and Wooleys Lane East
Oxford Boulevard between Station Road and Warwick Road
Warwick Road between Oxford Boulevard and Croyden Avenue
Croyden Avenue between dead end and Chadwick Road
Baker Hill Road between Warwick Road and Hampshire Road
Hampshire Road between Baker Hill Road and Piccadilly Road
Piccadilly Road between Hampshire Road and Middle Neck Road
Middle Neck Road between Nirvana Avenue and Baker Hill Road
Steamboat Road between Wesey Court and Centre Drive
Gilbert Road between Steamboat Road and Gay Drive
Redbrook Road between Gay Drive and Kings Point Road

Crews will move the main line wires underground along the following streets, Gay Drive between Redbrook Road and Gilbert Road and Gilbert Road between Gay Drive and Carriage Road. This will storm-harden the main line circuit while allowing the utility poles and overhead secondary electric wires in rear properties to continue connecting residents to the energy grid. In addition, switching equipment will be installed at Steamboat Road east of Elm Place Baker Hill Road east of Ruxton Road.


Manhasset 
Start date: August 2018

PSEG Long Island crews will be working on the following streets:
Deepdale Drive between Northern Boulevard (Route 25A) and Old Mill Road
Old Mill Road between Deepdale Drive and Vanderbilt Road
Vanderbilt Road between Old Mill Road and Country Club Drive
Country Club Drive between Vanderbilt Road and Soundview Crest
Soundview Crest between Country Club Drive and Timber Lane
Timber Lane between Soundview Crest and Chapel Road
Chapel Road between Timber Lane and Dover Road
Dover Road between Chapel Road and Harrow Lane
Aldershot Lane from Chapel Road to 155 Aldershot Lane
Harrow Lane between Dover Road and Bruce Lane
Bruce Lane between Harrow Lane and Dead End
Mill Spring Road between Country Club Drive and Payne Whitney Lane


University Gardens and the Village of Lake Success
Start date: April 2019

The main line electric wires will be moved underground along the following streets:
Horace Harding Boulevard between Links Drive and Bates Road
Bates Road between Horace Harding Boulevard and Soundview Drive
Soundview Drive between Bates Road and Robbins Lane
Robbins Lane between Soundview Drive and Westminster Road
Westminster Road between Robbins Lane and Northern Boulevard

This will storm-harden a main line circuit serving hundreds of customers in the area, while allowing the utility poles and overhead secondary electric wires to continue connecting residents to the energy grid with minimal disruptions.


Glen Head, Glenwood Landing, Greenvale, the Village of East Hills, and the Village of Roslyn Harbor 
The route will cover approximately 4 miles along an electric main line circuit. 
Posted date: September 7, 2018

PSEG Long Island crews will be working on the following streets:
Maple Place between Glen Head Road and Walnut Street
Walnut Street between Maple Place and Orchard Avenue
Orchard Avenue between Glen Head Road and Hewlett Place
Townsend Street between Glen Cove Road and Orchard Street
Orchard Street between Townsend Street and Scudders Lane
Scudders Lane between Glen Cove Road and Motts Cove Road North
Motts Cove Road North between Scudders Lane and Bryant Avenue
Bryant Avenue between Post Drive and Glen Cove Avenue
Glen Cove Road between Bryant Avenue and Elm Place
Motts Cove Road South between Bryant Avenue and Rear Property/Dead End
Museum Drive between LIRR ROW and Northern Boulevard (Route 25A)
Northern Boulevard (Route 25A) between Beech Drive and Wellington Road
Town Path between Northern Boulevard Route 25A) and Glen Cove Road  

In addition, switching equipment will be replaced at Northern Boulevard (Route 25A) east of Town Path


Manhasset and the Village of Flower Hill 
Start date: October 2018
Posted date: September 26, 2018

The main line electric wires will be moved underground along the following streets:
Mason Drive between Nassau Avenue and Pinewood Road    
Pinewood Road between Mason Drive and Bridge Road    
The Mall between Village Road and dead-end    
Village Road between The Mall and Winchester Drive    
Winchester Drive between Village Road and Harrow Lane    
Harrow Lane between Winchester Drive and Mayfair Lane

This will storm-harden a main line circuit serving hundreds of customers in the area, while allowing the utility poles and overhead secondary electric wires to continue connecting residents to the energy grid with minimal disruptions.


Albertson, East Williston, Roslyn Heights, Carl Place and the Village of Roslyn Heights 
The route will cover approximately 3.4 miles along an electric main line circuit. 
Start date: October 2018
Posted date: October 10, 2018

PSEG Long Island crews will be working on the following streets:
East Williston Avenue/Hillside Avenue (Route 25B) between Roslyn Road and Jericho Turnpike (Route 25) Junction.
Rear Property east of Campo Circle between 7 Campo Circle and 15 Campo Circle    
Glen Cove Road/Guinea Woods Road between I.U. Willets Road and Jericho Turnpike (Route 25)
Glen Cove Road/Guinea Woods Road between Northern State Parkway and Raff Avenue    
Dow Avenue between Glen Cove Road and dead end    
Side property west of 199 Dow Avenue    
Side property west of 3 Westbury Avenue    
Albertson Avenue between Dorset Avenue and Coventry Avenue
Dorset Avenue between Albertson Avenue and Branton Place

Crews will move the main line wires underground along the following streets: I.U. Willets Road between LIRR tracks and Roslyn Road and Roslyn Road between I.U Willets Road and Hilldale Road. This will storm-harden the main line circuit while allowing the utility poles and overhead secondary electric wires in rear properties to continue connecting residents to the energy grid. In addition, switching equipment will be installed or replaced at Roslyn Road north of Bengeyfield Drive and Glen Cove Road north of Hillside Avenue (Route 25B)


Villages of Great Neck Plaza and Great Neck Estate
The route will cover approximately 0.8 miles along an electric main line circuit. 

PSEG Long Island crews will be working on the following streets:
Bayview Avenue between Glenwood Drive and Cedar Drive
North and south forks of Hillcrest Drive intersecting Bayview Avenue
Elm Street between South Drive and South Middle Neck Road
Hillside Avenue between Elm Street and dead end
Cutter Mill Road between Ash Place and South Middle Neck Road

Crews will move the main line wires underground along the following streets: Bayview Avenue between South Drive and 37 Bayview Avenue
South Drive between Bayview Avenue and Maple Drive, Maple Drive between South Drive and Myrtle Drive, Myrtle Drive between Maple Drive and Sycamore Drive, Sycamore Drive between Bayview Avenue and Myrtle Drive, Magnolia Drive between Myrtle Drive and Gateway Drive
Cedar Drive between Magnolia Drive and Myrtle Drive, Gateway Drive between Magnolia Drive and 19 Gateway Drive

This will storm-harden the main line circuit while allowing the utility poles and overhead secondary electric wires in rear properties to continue connecting residents to the energy grid. In addition, switching equipment will be replaced at Cutter Mill Road west of Chelsea Place and Hillside Avenue south of Elm Street.


Villages of Kensington and Great Neck Plaza 
Start date: July 2018 

The main line electric wires will be moved underground along the following streets:
Stoner Avenue between East Drive/Barstow Road and Canterbury Road
East Drive/Barstow Road between Stoner Avenue and North Drive
North Drive between East Drive and Gilchrest Road

This will storm-harden a main line circuit serving hundreds of customers in the area, while allowing the utility poles and overhead secondary electric wires to continue connecting residents to the energy grid with minimal disruptions.   


Villages of Garden City and Mineola
The route will cover approximately 0.8 miles along an electric main line circuit.
Start date: January 2018
Posted date: December 19, 2018  

PSEG Long Island crews will be working on the following streets:
Willis Avenue between Harrison Avenue and Old Country Road
Old Country Road between Roslyn Road and Clinton Road   

In addition, switching equipment will be installed at Old Country Road west of Linden Street.


Carle Place and the Village of Westbury
The route will cover approximately 2.5 miles along an electric main line circuit.
Start date: January 2019
Posted date: December 21, 2018

PSEG Long Island crews will be working on the following streets:
West Owen Street between Old Country Road and Morningside Drive
Morningside Drive between Carle Road and Ellison Avenue
Ellison Avenue between Lexington Street and Old Country Road
Merchants Concourse between Old Country Road and Taylor Avenue
Westbury Avenue between Longwood Avenue and Ellison Avenue
Maple Avenue between Ellison Avenue and Spruce Street
Fulton Street between Maple Avenue and Park Avenue
Park Avenue between Fulton Street and Woods Road
Woods Road between Park Avenue and Jericho Turnpike (Route 25)   

In addition, switching equipment will be installed at West Owen Street north of Old Country Road, Ellison Avenue south of Maple Avenue, Fulton Street north of Maple Avenue and Woods Road south of Jericho Turnpike (Route 25)


Village of Mineola, Village of Westbury and Village of Old Westbury
The route will cover approximately 1.7 miles along an electric main line circuit.
Start Date: January 2019
Posted Date: January 16, 2019

PSEG Long Island crews will be working on the following streets:
Old Westbury Road between I U Willets Road and Jericho Turnpike (Route 25)
Ellison Avenue between Jericho Turnpike (Route 25) and Maple Avenue
Post Avenue between Jericho Turnpike (Route 25) and Park Avenue    
Barwick Boulevard between East Jericho Turnpike (Route 25) and Clemens Road

In addition, switching equipment will be installed at Old Westbury Road north of Jericho Turnpike (Route 25) and Ellison Avenue south of Jericho Turnpike (Route 25)


Village of East Williston and Village of Mineola 
The route will cover approximately 1 mile along an electric main line circuit. 
Start Date: January 2019
Posted Date: January 16, 2019

PSEG Long Island crews will be working on the following streets:
Sheridan Boulevard between Fairfield Avenue and Westbury Avenue
Downing Street between Roslyn Road and Congress Avenue
Congress Avenue between Downing Street and Brown Street
Sagamore Avenue between Sumter Avenue and East Williston Avenue (Route 25B)   

In addition, switching equipment will be installed at Hillside Avenue (Route 25B) east of Herricks Road, Willis Avenue south of Banbury Road and Downing Street east of Roslyn Road


Manhasset and the Village of Munsey Park
The route will cover approximately 1 mile along an electric main line circuit.
Start date: March 2019
Posted date: March 5, 2019

PSEG Long Island crews will be working on the following streets:
Northern Blvd (Route 25) between Deepdale Drive and Searingtown Road      


Manhasset and the Village of North Hills 
The route will cover approximately 0.5 miles along an electric main line circuit. 
Start date: March 2019
Posted date: March 5, 2019

PSEG Long Island crews will be working on the following streets:
Northern Boulevard at the intersection of Deep Dale Drive    
Rear property south of Old Estate Road between 16 Old Estate Road and 72 Old Estate Road   
Rear property north of Mill Spring Road between 257 Mill Spring Road and 329 Mill Spring Road   
Side property between 329 Mill Spring Road and 337 Mill Spring Road   
Side property between 334 Mill Spring Road and 340 Mill Spring Road   
Rear property south of Mill Spring Road between 340 Mill Spring Road and 352 Mill Spring Road   
Side property between 77 Sherry Hill Lane and 85 Sherry Hill Lane   
Side property between 76 Sherry Hill Lane and 84 Sherry Hill Lane
Side property between 133 Castle Ridge Road and 143 Castle Ridge Road
Side property between 134 Castle Ridge Road and 142 Castle Ridge Road   
Rear property south of Castle Ridge Road between 134 Castle Ridge Road and 94 Castle Ridge Road    


Villages of Munsey Park and Flower Hill and the hamlet of Manhasset
The route will cover approximately 2 miles along an electric main line circuit.
Start date: April 2019
Posted date: March 20, 2019

PSEG Long Island crews will be working on the following streets:
Nassau Avenue between Willow Place and Thayer Road
Thayer Road between Nassau Avenue and Park Avenue
Park Avenue between Thayer Road and Manhasset Woods Road
Manhasset Woods Road between Park Avenue and Northern Blvd (Route 25)
Northern Blvd (Route 25) between Deepdale Drive and Searingtown Road   
Rear Property south of Harrow Lane between Bruce Lane and Searingtown Road

In addition, switching equipment will be replaced at Plandome Road south of Dennis Street, Nassau Avenue east of Onderdonk Avenue and Manhasset Woods Road south of Hunt Lane


Village of Old Westbury
The route will cover approximately 2.8 miles along an electric main line circuit.
Start date: April 2019

PSEG Long Island crews will be working on the following streets:
Jericho Turnpike (Route 25) between Parkway Drive and Powells Lane
Across Jericho Turnpike (Route 25) between Parkway Drive and Rose Avenue   
East Jericho Turnpike (Route 25) between Northern State Parkway and Barwick Boulevard   

In addition, switching equipment will be installed at Jericho Turnpike (Route 25) west of Post Avenue 


Garden City Park, North New Hyde Park, and Herricks 
The route will cover approximately 3.4 miles along an electric main line circuit.
Start date: April 2019
Posted date: March 29, 2019

PSEG Long Island crews will be working on the following streets:
Hillside Avenue between Hyde Park Road and Marcus Avenue   
Denton Avenue between Hillside Avenue and Old Courthouse Road   
Old Courthouse Road between Duke Drive and Shelter Rock Road
Marcus Avenue between Hillside Avenue and West Vale Court   
Evergreen Avenue between Leonard Boulevard and Denton Avenue   
8th Street between Denton Avenue and Central Avenue   
Central Avenue between 8th Street and 4th Street   
6th Street between Central Avenue and Nassau Boulevard   
2nd Street between Central Avenue and Nassau Boulevard   
Nassau Boulevard between 6th Street and Atlantic Avenue   
Fulton Avenue between Thorens Avenue and Hilton Avenue   
Hilton Avenue between Fulton Avenue and Atlantic Avenue   
Cornelia Avenue between Broadway and Atlantic Avenue

In addition, switching equipment will be replaced at Marcus Avenue at the intersection with Denton Avenue and Old Courthouse Road west of Royal Way


Port Washington and the Villages of Plandome Manor and Baxter Estates
The route will cover approximately 3 miles along an electric main line circuit.
Start date: May 2019
Posted date: April 4, 2019

PSEG Long Island crews will be working on the following streets:
Shore Road between Central Drive and Main Street    
Main Street between Carlton Avenue and Covert Street   
Prospect Avenue between Main Street and Carlton Avenue   
Main Street between Third Avenue and Fifth Avenue   
North Plandome Road between Fifth Avenue and Water Lane   
Bayview Avenue between North Plandome Road and Mackey Avenue   
Carlton Avenue between Third Avenue and Murray Avenue   
Murray Avenue between North Plandome Road and Haven Avenue   
Mackey Avenue between Bayview Avenue and Murray Avenue   
Haven Avenue between Bayview Avenue and Beechwood Avenue   
South Bayles Avenue between Willowdale Avenue and Beechwood Avenue   
Beechwood Avenue between South Bayles Avenue and Port Washington Boulevard (Route 101)   

In addition, switching equipment will be installed or replaced at North Plandome Road north of Reid Avenue and North Plandome Road north of Bayview Avenue 


New Cassel and the Villages of Westbury and Old Westbury
The route will cover approximately 3 miles along an electric main line circuit.
Start date: May 2019
Posted date: April 18, 2019

PSEG Long Island crews will be working on the following streets:
Powells Lane between Store Hill Road and Rockland Street
Jericho Turnpike between Powells Lane and Westbury Lane
Rockland Street between School Street and Upland Street
Upland Street between Brush Hollow Road and Rockland Street
Brush Hollow Road between Prospect Avenue and Jefferson Street
Union Avenue between Rutland Street and Prospect Avenue
Prospect Avenue between Union Avenue and Magnolia Avenue
Siegel Street between Prospect Avenue and Broadway
Grand Street between Prospect Avenue and Broadway
Broadway between Grand Street and Swalm Street
Garden Street between Broadway and Railroad Avenue
Railroad Avenue between Garden Street and Urban Avenue
Hopper Street between Railroad Avenue and Main Street

In addition, switching equipment will be replaced at Rockland Street west of Cambridge Avenue, Powells Lane north of Franklin Street and Jericho Turnpike west of Powells Lane 


Roslyn Heights and the Village of Williston Park
The route will cover approximately .1 miles along an electric main line circuit.
Start date: Originally June 2019, Now September 2019
Posted date: June 6, 2019

PSEG Long Island crews will be working on the following streets:
Willis Avenue between Long Island Expressway (I-495) and Northern State Parkway

In addition, switching equipment will be installed or replaced at Willis Avenue south of Yale Street, Wentworth Avenue south of Evans Avenue, William Street west of Willis Avenue and Willis Avenue north of Hillside Avenue (Route 25B)


Carle Place and the Villages of Westbury and Mineola
The route will cover approximately 3.5 miles along an electric main line circuit.
Start date: June 2019
Posted date: June 6, 2019

PSEG Long Island crews will be working on the following streets:
Westbury Avenue between Ellison Avenue and Bruce Terrace bending into Plaza 200 Outlets
Glen Cove Road between Dow Avenue and Voice Road
Jamaica Boulevard between Westbury Avenue and Broadway
Broadway between Jamaica Boulevard and Carle Road
Carle Road between LIRR right-of-way and Harvard Street
Old Country Road between Mitchell Avenue and Zeckendorf Boulevard
Cherry Lane between Old Country Road and Asbury Avenue
Carle Road between Asbury Avenue and Jericho Turnpike

In addition, switching equipment will be installed at Cherry Road south of Jericho Turnpike and Cherry Lane and Westbury Avenue


Village of East Hills and the Hamlet of Roslyn Heights
The route will cover approximately 1.75 miles along an electric main line circuit.
Start date: June 2019
Posted date: June 7, 2019

PSEG Long Island crews will be working on the following streets:
Glen Cove Road between Town Path and Great Oaks Road
Harbor Hill Road between Glen Cove Road and Roslyn Road
Donald Street between Roslyn Road and Laurel Street
Rear property between LIRR right of way and the intersection of Laurel Street and Donald Street
LIRR right of way east of Expressway Plaza between Powerhouse Road and Orchard Street
Orchard Street between LIRR right of way and Locust Street
Locust Street between Orchard Street and Roslyn Road

In addition, switching equipment will be replaced at Harbor Hill Road east of Ash Drive, Glen Cove Rd south of Harbor Hill Road and Glen Cove Rd north of Harbor Hill Road


Great Neck Gardens and the Villages of Great Neck, Great Neck Plaza and Kensington
The route will cover approximately 2 miles along an electric main line circuit.
Start date: June 2019
Posted date: June 17, 2019

PSEG Long Island crews will be working on the following streets:
Barstow Road between Grace Avenue and Stoner Avenue
Stoner Avenue between Barstow Road and Gilchrest Road
Allenwood Road between Warwick Road and Plymouth Road
Plymouth Road between Allenwood Road and Baker Hill Road
Wooleys Lane between Plymouth Road and Station Road
Station Road between Hutchinson Court and Oxford Boulevard
Baker Hill Road between Warwick Road and Chadwick Road
Chadwick Road between Baker Hill Road and Croyden Avenue
Brampton Lane between Croyden Avenue and Hicks Lane
Fairview Avenue between Brampton Lane and Hampshire Road
Weybridge Road between Fairview Avenue and Hicks Lane
Hampshire Road between Fairview Avenue and Hicks Lane
Hicks Lane between Spring Lane and Forest Row

In addition, switching equipment will be replaced at Hicks Lane west of Maple Grove Street and Chadwick Road north of Baker Hill Road


Great Neck Gardens and the Villages of Great Neck, Great Neck Plaza and Kensington
The route will cover approximately 2 miles along an electric main line circuit.
Start date: July 2019 
Posted date: July 3, 2019

PSEG Long Island crews will be working on the following streets:
Kings Point Road between Steamboat Road and West Shore Road
West Shore Road between Kings Point Road and Capri Lane
Bayview Avenue between West Shore Road and Bluebird Drive
Old Mill Road between Brookbridge Road and Strathmore Road
Old Mill Road between Brook Lane and Middle Neck Road
Piccadilly Road between Middle Neck Road and Berkshire Road
Middle Neck Road between Preston Road and Allenwood Road
Barstow Road between Stoner Avenue and Grace Avenue
Grace Avenue between Bond Street and Colonial Road

In addition, switching equipment will be replaced at Old Mill Road east of Polo Road and Piccadilly Road east of Middle Neck Road.


Great Neck Gardens, Villages of Kings Point, Great Neck, and Thomaston
The route will cover approximately 2.5 miles along an electric main line circuit.
Start date: July 2018

PSEG Long Island crews will be working on the following streets:
Gilchrest Road between Grace Avenue and Nassau Drive
Station Road between Gilchrest Road and Wooleys Lane East
Oxford Boulevard between Station Road and Warwick Road
Warwick Road between Oxford Boulevard and Croyden Avenue
Croyden Avenue between dead end and Chadwick Road
Baker Hill Road between Warwick Road and Hampshire Road
Hampshire Road between Baker Hill Road and Piccadilly Road
Piccadilly Road between Hampshire Road and Middle Neck Road
Middle Neck Road between Nirvana Avenue and Baker Hill Road
Steamboat Road between Wesey Court and Centre Drive
Gilbert Road between Steamboat Road and Gay Drive
Redbrook Road between Gay Drive and Kings Point Road

PSEG Long Island crews will be working on the following streets:
Bayview Avenue between Glenwood Drive and Cedar Drive
North and south forks of Hillcrest Drive intersecting Bayview Avenue
Elm Street between South Drive and South Middle Neck Road
Hillside Avenue between Elm Street and dead end
Cutter Mill Road between Ash Place and South Middle Neck Road

In addition, switching equipment will be replaced at Cutter Mill Road west of Chelsea Place and Hillside Avenue south of Elm Street

 


 
Great Neck Gardens, Villages of Kings Point, Great Neck, and Thomaston
The route will cover just over 2 miles along an electric main line circuit
Start date: October 2019
Posted date: October 15, 2019

PSEG Long Island crews will be working on the following streets:
Gilchrest Road between Grace Avenue and Nassau Drive
Station Road between Gilchrest Road and Wooleys Lane East
Oxford Boulevard between Station Road and Warwick Road
Warwick Road between Oxford Boulevard and Croyden Avenue
Croyden Avenue between dead end and Chadwick Road
Baker Hill Road between Warwick Road and Hampshire Road
Hampshire Road between Baker Hill Road and Piccadilly Road
Piccadilly Road between Hampshire Road and Middle Neck Road
Middle Neck Road between Nirvana Avenue and Baker Hill Road
Steamboat Road between Wesey Court and Centre Drive
Gilbert Road between Steamboat Road and Gay Drive
Redbrook Road between Gay Drive and Kings Point Road

 

University Gardens and the Village of Lake Success
The route will cover 2 miles along an electric main line circuit
Start date: November 2019
Posted date: October 25, 2019

PSEG Long Island crews will be working on the following streets:
Great Neck Road between Water Mill Lane and Northern Boulevard
Clair Street between Great Neck Road and Jayson Avenue
Buttonwood Road between Northern Boulevard and Pembroke Avenue
Bates Road between Concord Street and Horace Harding Boulevard
Horace Harding Boulevard between Bates Road and North Service Road
North Service Road between Horace Harding Boulevard and Community Drive
Lakeville Road between Meadow Woods Road and North Service Road
Lakeville Road between South Service Road and Lake Road

In addition, switching equipment will be replaced at Great Neck Road south of Clair Street

 


Villages of Great Neck, Kensington, Kings Point, and Thomaston
The route will cover 3 miles along an electric main line circuit
Start date: November 2019
Posted date: October 25, 2019

PSEG Long Island crews will be working on the following streets:
Middle Neck Road between Kings Terrace Road and Steamboat Road
Redbrook Road between Bancroft Lane and Middle Neck Road
Side property between 45 Red Brook Road and 49 Red Brook Road
Franklin Road between Forest Row and Spring Lane
Spring Lane between Henhawk Road and Hicks Lane
Hicks Lane between Spring Lane and Station Road
Brampton Lane between Hicks Lane and Fairview Avenue
Station Road between Hicks Lane and Wooleys Lane
Ravine Road between Station Road and East Shore Road
East Shore Road between Ravine Road and Colonial Road

In addition, switching equipment will be installed at Middle Neck Road north of Redbrook Road a nd East Shore Road south of Ravine Road



Great Neck Gardens, the Village of Great Neck Estates, Village of Great Neck Plaza and Village of Thomaston

The route will cover 4.6 miles along an electric main line circuit
Start date: November 2019
Posted date: November 19, 2019

PSEG Long Island crews will be working on the following streets:
Allenwood Road between Middle Neck Road and Plymouth Road
Brompton Road between Pont Street and South Middle Neck Road
South Middle Neck Road between Brompton Road and Melbourne Road

In addition, switching equipment will be installed at Allenwood Road east of Middle Neck Road, Allenwood Road east of Warwick Road, South Middle Neck Road east of Brompton Road and Mill River Road south of Centre View Drive

 


Villages of Flower Hill and Plandome Manor and the Hamlet of Port Washington
The route will 3.16 miles along an electric main line circuit
Start date: December 2019
Posted date: December 6, 2019

PSEG Long Island crews will be working on the following streets:

Haven Avenue between Willowdale Avenue and Birchwood Avenue
Neulist Avenue between dead end/LIRR right of way and Port Washington Boulevard
Port Washington Boulevard (Route 101) between Concord Road and Homewood Place
Transmission right of way/Rear Property south of Winthorp Road and Harbor Links Golf Course between Port Washington Boulevard (Route 101) and West Shore Road
Stony Town Road between Port Washington Boulevard (Route 101) and Colonial Drive
Rear Property (St. Francis Hospital) between Port Washington Boulevard (Route 101) and Crabapple Road
Middle Neck Road between Port Washington Boulevard (Route 101) and Northern Boulevard (Route 25A)



University Gardens and the Village of Lake Success
The route will cover approximately 0.3 miles along an electric main line circuit
Start date: December 2019
Posted date: December 19, 2019 

PSEG Long Island crews will be working on the following streets:
Aster Lane between Northern Boulevard and dead end
Jayson Avenue between Great Neck Road and Clair Street
Rear property between Horace Harding Boulevard and Soundview Drive
Rear property between Somerset Drive South and Aster Lane

In addition, switching equipment will be replaced at Northern Boulevard south of Iris Lane

 


Albertson and Roslyn Heights
The route will cover approximately 2.5 miles along an electric main line circuit
Start date: January 2020
Posted date: January 16, 2020

PSEG Long Island crews will be working on the following streets:
I. U. Willets Rd between Searingtown Road and Willis Ave
Willis Avenue between McKinley Avenue and the Long Island Expressway (I-495)
Rear Property between north of North Court between Willis Avenue and dead-end
Powerhouse Road between N Service Road and Mineola Avenue
Mineola Avenue between Powerhouse Road and Hillside Avenue
Woodward Street between Mineola Avenue and Van Norstrand Avenue
Van Norstrand Avenue between Woodward Street and Villa Street
Villa Street between Van Norstrand Avenue and Mineola Avenue

In addition, switching equipment will be replaced at East Broadway south of Davis Lane


Garden City Park
The route will cover approximately 2.6 miles along an electric main line circuit
Start date: January 2020
Posted date: January 16, 2020

PSEG Long Island crews will be working on the following streets:
Hillside Avenue between Moore Street and Marcus Avenue
Marcus Avenue between Hillside Avenue and Jericho Turnpike
Jericho Turnpike between Nassau Boulevard and Herricks Road
County Court House Road between Fulton Avenue and Jericho Turnpike
Bedford Avenue between County Court House Road and Thorens Avenue
Park Avenue between County Court House Road and Thorens Avenue
Broadway between County Court House Road and Armstrong Road

In addition, switching equipment will be replaced at Hillside Avenue east of Allen Street



Village of Lake Success, Village of Floral Park, and Village of New Hyde Park
The route will cover approximately 2 miles along an electric main line circuit
Start date: January 2020
Posted date: January 29, 2020

PSEG Long Island crews will be working on the following streets:
Belmont Avenue between Jericho Turnpike and Lowell Avenue
Lowell Avenue between Belmont Avenue and Barwick Street
Barwick Street between Lowell Avenue and Bryant Avenue
Bryant Avenue between Barwick Street and Cherry Lane
Cherry Lane between Bryant Avenue and White Avenue
White Avenue between Cherry Lane and North 1st Street
Stewart Avenue between Hillside Avenue and 83rd Avenue
83rd Avenue between Stewart Avenue and Langdale Street
Langdale Street between 83rd Avenue and 81st Avenue
Stewart Avenue between 80th Avenue and 78th Avenue
78th Avenue between Stewart Avenue and Lakeville Road
Lakeville Road between 78th Avenue and Rose Lane

In addition, switching equipment will be replaced at Cherry Lane and Bryant Avenue, Jericho Turnpike east of Ingraham Lane and Jericho Turnpike west of 249th Street


Garden City Park, Village of Garden City, Village of New Hyde Park and Village of Stewart Manor
The route will cover approximately 3.75 miles along an electric main line circuit
Start date: February 2020
Posted date: February 5, 2020

PSEG Long Island crews will be working on the following streets:
Stewart Avenue between Elton Road North and Jefferson Street
South 11th Street between Stewart Avenue and 3rd Avenue
3rd Avenue between South 11th Street and Baer Place
4th Avenue between New Hyde Park Road and South 12th Street
2nd Avenue between South 12th Street and Herkomer Street
Herkomer Street between 2nd Avenue and Jericho Turnpike
New Hyde Park Road between Clinch Avenue (south cut through) and Stratford Avenue
New Hyde Park Road between Plaza Avenue and Lincoln Avenue
Leonard Boulevard between Belmont Avenue and West End Avenue
West End Avenue between Leonard Boulevard and Denton Avenue
3rd Street between Denton Avenue and Central Avenue
Central Avenue between 5th Street and Jericho Turnpike
5th Avenue between Jericho Turnpike and Railroad Avenue
Park Avenue between 5th Avenue and Nassau Boulevard
Corbin Avenue between Park Avenue and Atlantic Avenue
Atlantic Avenue between 5th Avenue and Thorens Avenue


 

Completed Projects

Villages of Sands Point, Manorhaven, and Port Washington North

Middle Neck Road between Old Barn Lane and Sands Point Road
Sands Point Road between Middle Neck Road and Cow Neck Road/Shore Road
Barkers Point Road between Hicks Lane and Cow Neck Road
Cow Neck Road between Middle Neck Road and Shore Road
Shore Road between Cow Neck Road and Manhasset Avenue

Port Washington and the Villages of Sands Point and Baxter Estates

Cedar Lane between Barkers Point Road and Cornwall Lane
Cornwall Lane between Cedar Lane and Marwood Road North
Marwood Road North between Cornwall Lane and Manorhaven Boulevard
Manorhaven Boulevard between Linwood Road and Edgewood Road
South Washington Street between Main Street and Webster Avenue
Webster Avenue between Carlton Avenue and Monroe Street
Monroe Street between Webster Avenue and Van Buren Street
Van Buren Street between Monroe Street and Lincoln Place
Lincoln Place between Van Buren Street and Franklin Avenue
Franklin Avenue between Lincoln Place and Mackey Avenue
Mackey Avenue between the east and west intersections of Franklin Avenue
Franklin Avenue between Mackey Avenue and Belleview Avenue
Belleview Avenue between Franklin Avenue and Bayview Avenue

In addition, switching equipment will be replaced at Marwood Road North south of Cornwall Lane and Shore Road west of Bayside Avenue.

Roslyn Heights and Albertson
Start date: August 2018

PSEG Long Island crews will be working on the following streets:
I.U. Willets Road between LIRR tracks and Roslyn Road
Roslyn Road between I.U Willets Road and Hilldale Road

Port Washington and the Villages of Sands Point and Port Washington North
Start date: October 2017

PSEG Long Island crews will be working on the following streets:
Middle Neck Road between Sands Point Road and Thayer Lane
Radcliff Avenue between Middle Neck Road and Soundview Drive
Avenue C/Valley Road between Radcliff Avenue and Harbor Road
Harbor Road between Avenue C/Valley Road and Liberty Lane
Port Washington Boulevard (Route 101) between Harbor Road and Eastern Crest Road
Sandy Hollow Road between Port Washington Boulevard (Route 101) and Sandy Hollow Lane
Irma Avenue between Sandy Hollow Road and Main Street

In addition, switching equipment will be replaced at Middle Neck Road east of Governors Lane, Middle Neck Road south of Rockwood Avenue, and Avenue C/Valley Road north of Harbor Road

Village of Mineola
The route will cover approximately 2.5 miles along an electric main line circuit.
Start date: November 2018
Posted date: October 23, 2018

PSEG Long Island crews will be working on the following streets:
First Street between Marcellus Road and Third Avenue
Horton Highway between First Street and Washington Avenue
Jefferson Avenue between Horton Highway and Willis Avenue
Mineola Boulevard between Garfield Avenue and Jericho Turnpike
Willis Avenue between Lincoln Avenue and Jericho Turnpike
Washington Avenue between Willis Avenue and Roslyn Road
Cottage Place between Roosevelt Place and Roslyn Road
Roosevelt Place between Cottage Place and Second Street
Second Street between Willis Avenue and Roslyn Road
East Second Street between Roslyn Road and Hampton Street

In addition, switching equipment will be installed at Horton Highway south of Washington Avenue, Jefferson Avenue east of Horton Highway and Roslyn Road north of Washington Avenue

Villages of Garden City and Mineola in the Towns of Hempstead and North Hempstead
The route will cover approximately 0.8 miles along an electric main line circuit.
Start date: February 2018

PSEG Long Island crews will be working on the following streets:
Willis Avenue between Harrison Avenue and Old Country Road
Roslyn Road between Hinck Way and Old Country Road
Old Country Road between Roslyn Road and Clinton Road

Crews will move the main line wires underground along the following streets Seabury Road between Old Country Road and Surrey Lane, Surrey Lane between Seabury Road and Avalon Road and Avalon Road between Surrey Lane and Clinton Road.  This will storm-harden the main line circuit while allowing the utility poles and overhead secondary electric wires in rear properties to continue connecting residents to the energy grid. In addition, switching equipment will be installed at Old Country Road west of Linden Street.

Village of Great Neck, Village of Great Neck Estates, Village of Great Neck Plaza, Village of Thomaston
The route will cover approximately 2 miles along an electric main line circuit.
Start date: December 2018
Posted date: December 19, 2018

PSEG Long Island crews will be working on the following streets:
Shore Cliff Place between Hawthorne Lane and Parkwood Drive
Rear property on the south side of Shore Park Road between Shore Cliff Place and 43 Shore Park Road
Rear property on the north side of Parkwood Drive between Shore Cliff Place and 8 Parkwood Drive
Side property between 8 Parkwood Drive and 10 Parkwood Drive
Side property between 7 Parkwood Drive and 9 Parkwood Drive
Rear property on the south side of Parkwood drive between 3 Parkwood Drive and 7 Parkwood Drive
Shore Drive between waterfront park and Cedar Drive
Cedar Drive between Shore Drive and Bayview Avenue
Bayview Avenue between Sycamore Drive and Ascot Ridge
Knightsbridge Road between Great Neck Road and Pont Street
Pont Street between Knightsbridge Road and South Middle Neck Road
South Middle Neck Road between Pont Street and The Reverend M.L.K. Jr. Avenue
The Reverend M.L.K. Jr. Avenue between South Middle Neck Road and Welwyn Road
Shoreward Drive between Welwyn Road and Ardsley Place

In addition, switching equipment will be installed at Old Cutter Mill Road south of Ascot Ridge