Town of North Hempstead

Power On Projects

PSEG Long Island is committed to strengthening the electric infrastructure and improving reliability and will be continuing to storm harden the system. Power On will focus on mainline circuits, the backbone of PSEG Long Island’s distribution system. The mainlines feed the many branch lines that power the homes and businesses in your community.

For a list of completed projects, visit the Town of North Hempstead Completed Projects page.

 

Village of Mineola

Start date: June 2020
Posted date: June 16, 2020

The route will cover approximately 1.42 miles along an electric main line circuit. PSEG Long Island crews will be working on the following streets:
Old Country Road from Washington Avenue to east of Clinton Road, near the Roosevelt Field Mall entrance
Rear property between Wisteria Avenue and Eagle Rock Apartments on Laurel Drive from Vanderbilt Drive N. to Old Country Road
From westernmost point of Voice Road south through commercial area and over the Long Island Rail Road ROW to Vanderbilt Drive N.
Glen Cove Road at Old Country Road to northbound merge lane
Corner of Weybridge Road and Albertson Place


Villages of Manorhaven, Port Washington North and Baxter Estates

Start date: June 2020
Posted date: June 16, 2020

The route will cover approximately 1.7 miles along an electric main line circuit. PSEG Long Island crews will be working on the following streets:
Manorhaven Boulevard between Marwood Road and Kirkwood Road
Manorhaven Boulevard between Firwood Road and Sands Point Road/Shore Road
Sands Point Road between south of Cambridge Avenue and Manorhaven Boulevard
Shore Road between Manorhaven Boulevard and Columbia Place
Harbor Road between Shore Road to west of Sandy Hollow Road
Marwood Road between south of Cambridge Avenue and Manorhaven Boulevard
Columbia Place between Shore Road and High Street
High Street between Columbia Place and Main Street
Main Street at High Street and onto S Washington Street


Village of Old Westbury and Roslyn Heights

Start date: July 2020
Posted date: July 29, 2020

The route will cover approximately 3.15 miles along an electric main line circuit. PSEG Long Island crews will be working on the following streets:
Wheatley Road between north of Garvan-Whitney-Phipps Road to Trusdale Court
Rear Property between Trusdale Court and Private Road west to Hastings Road
Hastings Road between Red Ground Road and Surrey Lane
Red Ground Road between Glen Cove Road and Spring Hill Lane
Kennedy Road between Glen Cove Road and Red Ground Road


Villages of East Hills and Brookville

Start date: July 2020
Posted date: July 29, 2020

The route will cover approximately 3.11 miles along an electric main line circuit. PSEG Long Island crews will be working on the following streets:
Northern Boulevard between east of Addison Lane to west of Cedar Swamp Road
Rear property east of Flamingo Road between Northern Boulevard and Tara Drive
Rear property north of Tara Drive and south of Northern Woods Road between Flamingo Road and Peacock Drive
Rear property east of Peacock Drive between Tara Drive and Falcon Road
Rear property north of Falcon Road between Peacock Drive and Hummingbird Drive
Rear Property east of Gold Coast Road between Northern Boulevard and Old Wheatley Road
Private Road (off of Old Wheatley Road and east of Gold Coast Road) between Old Wheatley Road and Meadowbrook Lane