Town of Brookhaven

Power On Projects

PSEG Long Island is committed to strengthening the electric infrastructure and improving reliability and will be continuing to storm harden the system. Power On will focus on mainline circuits, the backbone of PSEG Long Island’s distribution system. The mainlines feed the many branch lines that power the homes and businesses in your community.

For a list of completed projects, visit the Town of Brookhaven Completed Projects page.  

 

Coram

Start Date: October 2020
Posted Date: October 1, 2020

The route will cover approximately .87 miles along an electric main line circuit. PSEG Long Island crews will be working on the following streets:
South Bicycle Path between Cherokee Avenue and Ski Run Lane


Rocky Point

Start Date: November 2020
Posted Date: October 27, 2020

The route will cover approximately 1.55 miles along an electric main line circuit. PSEG Long Island crews will be working on the following streets:
Rocky Point Landing Road between The Lane and Apricot Road
Nymph Road between Locust Drive and Rocky Point Landing Road


FEMA Projects

Stony Brook, Setauket, and the Village of Old Field

The route will cover approximately 6 miles along an electric main line circuit. PSEG Long Island crews will be working on the following streets:

North Country Road (Route 25A) between Quaker Path and Overlook Way
Nicolls Road between North Country Road (Route 25A) and Sheep Pasture Road
North Country Road (Route 25A) between Bennetts Road and Limroy Lane
Quaker Path between North Country Road (Route 25A) and Mount Grey Road
Mount Grey Road between Quaker Path and Old Field Road
Ridgeway Avenue between Quaker Path and Mud Road
Blueberry Ridge Road between Mount Grey Road and Quaker Path
Quaker Path between Blueberry Ridge Road and Old Field Road
Old Field Road between Mount Grey Road and west of Lake Street

In addition, switching equipment will be installed at Quaker Path north of North Country Road (Route 25A)


St. James, Stony Brook, and the Village of Head of the Harbor

The route will cover approximately 4.5 miles along an electric main line circuit.
Start Date: November 2018

PSEG Long Island crews will be working on the following streets:
North Country Road (Route 25A) between Moriches Road and Blydenburgh Lane    
Mills Pond Road between North Country Road and LIRR tracks
Stony Brook Road between North Country Road (Route 25A) and Memory Way
Oxhead Road between Stony Brook Road and Ballad Lane

Crews will move the main line wires underground along the following streets:

Oxhead Road between Ballad Lane and Nicholls Road
Stony Brook Road between Dogwood Drive and North County Road (under LIRR tracks)

This will storm-harden the main line circuit while allowing the utility poles and overhead secondary electric wires in rear properties to continue connecting residents to the energy grid. In addition, switching equipment will be replaced at North Country Road (Route 25A) west of Mills Pond Road, Stony Brook Road east of North Country Road (Route 25A) and Stony Brook Road south of University Heights Drive


Nesconset and the Village of Lake Grove

The route will cover approximately 3 miles along an electric main line circuit.
Start Date: November 2018
Posted Date: October 31, 2019

PSEG Long Island crews will be working on the following streets: 
Nesconset-Port Jefferson Highway (Route 347) between Fairhaven Drive East and Garfield Court
Nichols Road between Woodview Drive and Browns Road
Lillian Road between Nichols Road and Eklund Boulevard
Eklund Boulevard between Lillian Road and Audubon Street
Audubon Street between Eklund Boulevard and Magnolia Avenue
Magnolia Avenue between Audubon Street and Hudson Avenue
Hudson Avenue between Smith Street and Sussex Lane 

In addition, switching equipment will be installed at Gibbs Pond Road between Nichols Road and Locksley Lane, Nichols Road between Gibbs Pond Road and Woodview Drive and Magnolia Avenue between Hudson Avenue and Oriental Avenue