Town of Hempstead

FEMA Electric Circuit Improvement Projects

We're upgrading key electric circuits in your neighborhood to improve reliability of the electric grid.

Project Locations


Levittown

PSEG Long Island crews will be working on the following streets:
Farmedge Road between Celestial Lane and Henry Street
Henry Street between Farmedge Road and Edna Avenue

Crews will move the main line wires underground along the following streets:
Bloomingdale Road between Alan Crest Drive and Farmedge Road
Farmedge Road between Bloomingdale Road and Jupiter Lane
Tiller Lane between Bloomingdale Road and Prentice Road
Wantagh Avenue between Edna Avenue and Carol Road
Transmission right-of -way east of Wantagh Avenue across from Universe Drive 

In addition, switching equipment will be installed at Bloomingdale Road south of Alan Crest Drive and Farmedge Road east of Jupiter Lane.



Baldwin and Roosevelt
Start date: October 2017

PSEG Long Island crews will be working on the following streets:
Central Avenue between LIRR Parking Lot and Cottage Place
LIRR Parking Lot between Central Avenue and Milburn Avenue
Milburn Avenue between LIRR Parking Lot and Grand Avenue
Rear Property of Baldwin Shopping Center
Holly Street between Stanton Avenue and dead end
Stanton Avenue between Grand Avenue and Brookside Avenue
Brookside Avenue between Stanton Avenue and Centennial Avenue
Hudson Avenue between Brookside Dr and Pennsylvania Avenue
Pennsylvania Avenue between Centennial Avenue and Maple Drive
Maple Drive between Pennsylvania Avenue and Taylor Avenue
Taylor Avenue between Maple Drive and Nassau Road
Nassau Road between Taylor Avenue and Centennial Avenue
Fulton Avenue between Pennsylvania Avenue and Babylon Turnpike
Elysian Terrace between Fulton Avenue and Centennial Avenue
Babylon Turnpike between Centennial Avenue and Smith Street
Frederick Avenue between Babylon Turnpike and Decatur Street
Decatur Street between Babylon Turnpike and Irving Street
Irving Street between Decatur Street and Grant Street
Grant Street between Irving Street and Washington Avenue

In addition, switching equipment will be replaced at Brookside Avenue north of Maryland Avenue, Babylon Turnpike south of Frederick Avenue, Babylon Turnpike north of Smith Street.


Village of Valley Stream 
Start date: June 2018

PSEG Long Island crews will be working on the following streets: 
Dutch Broadway between Elmont Road and Fletcher Avenue
Fletcher Avenue between Dutch Broadway and Bowe RoadCorona Avenue between Dutch Broadway and Midvale Lane


In addition, switching equipment will be installed at Elmont Road north of Cromer Road West and Fletcher Avenue north of Edlu Court 


Franklin Square and the Villages of Stewart Manor and Floral Park 
Start date: originally scheduled for July 2018, now February 2019
Posted date: January 28, 2019

PSEG Long Island crews will be working on the following streets:
Stewart Street between Plainfield Avenue and Stewart Avenue
Tulip Avenue between Plainfield Avenue and Barrymore Boulevard
Gilmore Boulevard between Tulip Avenue and Reed Avenue
Averill Boulevard between Tulip Avenue and Whiteside Avenue
Rear Property on the west side of Farnum Boulevard between Averill Boulevard and Substation
Cambridge Avenue between Tulip Avenue and Carlton Terrace
Carlton Terrace between Chester Avenue and Salisbury Avenue
Chester Avenue between Bromeligh Road and Carlton Terrace
Salisbury Avenue between Covet Avenue and Jefferson Street

The main line electric wires will be moved underground to bypass rear properties along the following streets:
Carlton Terrace between Chester Avenue and Cambridge Ave

In addition, switching equipment will be installed or replaced at Plainfield Avenue south of Stewart Avenue, Tulip Avenue east of Harvard Street, Tulip Avenue east of Fern Street and Gilmore Boulevard south of Tulip Avenue.


East Meadow and Levittown 
Start date: August 2018

PSEG Long Island crews will be working on the following streets:
Newbridge Road (Route 106) between Hempstead Turnpike (Route 24) and Dogwood Lane
Hempstead Turnpike (Route 24) between Newbridge Road (Route 106) and Clearmeadow Drive
Prospect Avenue between Hempstead Turnpike (Route 24) and Gladmore Street
Seventh Street between Prospect Avenue and Franklin Avenue
Franklin Avenue between Fifth Street and Devon Street
Devon Street between Prospect Avenue and Cole Drive
Cole Drive between Devon Street and Fairhaven Road
Fairhaven Road between Cole Drive and East Meadow Ave
East Meadow Avenue between Front Street (Route 102) and Prospect Avenue
Glenmore Avenue between East Meadow Ave and Chestnut Avenue
Chestnut Avenue between Glenmore Ave and Prospect Avenue
Prospect Avenue between East Meadow Ave and Bellmore Avenue

In addition, switching equipment will be replaced at Prospect Avenue north of Bellmore Avenue and Chestnut Avenue west of Prospect Avenue.


Oceanside and the Villages of Lynbrook and East Rockaway
Start date: July 2018

PSEG Long Island crews will be working on the following streets:
Merrick Road between Horton Avenue and Nieman Avenue
Wilson Avenue between Merrick Road and Sherman Street
John Street between Merrick Road and Wood Street
Lyon Place between Wood Street and Langdon Place
Columbus Drive between Merrick Road and Langdon Place
Union Place between Broadway and Union Avenue
Union Avenue between Scranton Avenue and Atlantic Avenue
Atlantic Avenue between Union Avenue and Columbia Avenue
Woods Avenue between Atlantic Avenue and Denton Avenue
Denton Avenue between Woods Avenue and Atlantic Avenue
Atlantic Avenue between Main Street and Access Road

In addition, switching equipment will be installed or replaced at Merrick Road east of Horton Ave, Wilson Avenue north of Merrick Road, John Street south of Merrick Road and Union Avenue at intersection of New Street.


Villages of Lynbrook and Hempstead
Start date: July 2018

PSEG Long Island crews will be working on the following streets:
Burtis Street between Dawes Avenue and Wilson Avenue
Wilson Avenue between Burtis Street and Merrick Road
Sherman Street between Harding Avenue and Summit Avenue
Summit Avenue between Sherman Street and Walnut Street
Walnut Street between Summit Avenue and Denton Avenue
Denton Avenue between Walnut Street and Oak Street
Oak Street between Denton Avenue and Lynbrook Avenue
Lynbrook Avenue between Oak Street and Merrick Road
St. James Place between Earle Avenue and Forest Avenue
Denton Avenue between Sunrise Highway and Manor Road
Elm Street between Denton Avenue and Huntington Avenue
Huntington Avenue between Rocklyn Avenue and Newton Avenue
Rocklyn Avenue between Vincent Place and Garfield Place
Ocean Avenue between Village Avenue and Garfield Place

In addition, switching equipment will be replaced at Walnut Street east of Hempstead Avenue, Merrick Road between Ocean Avenue and Rocklyn Avenue and Ocean Avenue south of Garfield Place.


Oceanside and Baldwin
Start date: July 2018

PSEG Long Island crews will be working on the following streets:
Oceanside Road between Windsor Parkway and Sunnyside Road
Sunnyside Road between Oceanside Road and Brower Avenue
Brower Avenue between Sunnyside Road and Fortesque Avenue
Fortesque Avenue between Brower Avenue and Foxhurst Road
Foxhurst Road between Sheldon Place and Merrick Road
Oceanside Road between Foxhurst Road and Eileen Road
West End Avenue between Foxhurst Road and Thomas Avenue
Thomas Avenue between West End Avenue and Grand Avenue
Merrick Road between Gale Avenue and Central Avenue
Harrison Avenue between Sunrise Highway (Route 27) and Clinton Place

In addition, switching equipment will be installed at Brower Avenue east of Fortesque Avenue, Thomas Avenue east of West End Avenue, and Merrick Road west of Central Avenue.


East Meadow
The route will cover approximately 2.5 miles along an electric main line circuit.
Start date: Originally July 2018, now February 2019
Posted date: January 28, 2019

PSEG Long Island crews will be working on the following streets:
Stewart Avenue between Meadowbrook State Parkway and Merrick Avenue
Merrick Avenue between Stewart Avenue and Bellmore Avenue

In addition, switching equipment will be installed at Front Street and Jeffrey Avenue


West Hempstead, Baldwin and the Village of Hempstead 
Start date: August 2018

PSEG Long Island crews will be working on the following streets:
Eagle Avenue between Hempstead Gardens Drive and Southern State Parkway
Park Avenue between Eagle Avenue and Maple Street
Maple Street between Park Avenue and Kent Place
Kent Place between Maple Street and Elm Street
Elm Street between Kent Place and Hempstead Gardens Drive
Hempstead Gardens Drive between Washington Avenue and Hempstead Avenue
Peninsula Boulevard between Southern State Parkway and Sycamore Avenue
Alabama Avenue between Peninsula Boulevard and Virginia Avenue
West Graham Avenue between Peninsula Boulevard and Baldwin Road
Sycamore Avenue between Rose Avenue and West Graham Avenue
South Franklin Street between Peninsula Boulevard and West Graham Avenue
Baldwin Road between Greenwich Street and Southern State Parkway
Grand Avenue between Southern State Parkway and Maude Street
Acacia Avenue between Baldwin Road and Milburn Avenue
Harold Avenue between Baldwin Avenue and Milburn Avenue

In addition, switching equipment will be replaced at Elm Street east of Hempstead Gardens Drive, Peninsula Boulevard north of West Graham Avenue, West Graham Avenue west of South Franklin Street and Baldwin Road south of Greenwich Street.


Elmont
Start date: August 2018

PSEG Long Island crews will be working on the following streets:
Stanwich Place between Baylis Avenue and Renfrew Avenue
Renfrew Avenue between Stanwich Place and Croydon Road
Croydon Road between Renfrew Avenue and Leighton Road
Leighton Road between Croydon Road and Astor Street
Astor Street between Leighton Road and Dutch Broadway
Dutch Broadway between Astor Street and 238th Street
238th Street between Dutch Broadway and 115th Road


Baldwin and Oceanside
Start date: July 2018

PSEG Long Island crews will be working on the following streets:
Harrison Avenue between Merrick Road and Thomas Avenue
Thomas Avenue between Hansen Place and West End Avenue
Grand Avenue between Thomas Avenue and Atlantic Avenue
Atlantic Avenue between Verity Lane and Fortesque Avenue
Waukena Avenue between Brower Avenue and Balsam Street
Grand Avenue between Lincoln Street and Bonnie Drive
Bonnie Drive between Grand Avenue and Schreiber Place
Lincoln Street between Grand Avenue and Chess Drive
Chess Drive between Lincoln Street and Verity Lane
Verity Lane between Chess Drive and Hastings Street
Hastings Street between Verity Lane and Western Boulevard

In addition, switching equipment will be installed at Waukena Avenue east of Balsam Street, Atlantic Avenue west of Yale Place, Atlantic Avenue west of Verity Lane, Grand Avenue and Lincoln Street, Bonnie Drive east of Grand Avenue, Grand Avenue north of Church Street and Thomas Avenue east of Harrison Avenue


Uniondale and the Village of Hempstead 
The route will cover approximately 3.7 miles along an electric main line circuit.
Start date: September 2018

PSEG Long Island crews will be working on the following streets:
Grove Street between Peninsula Boulevard and South Franklin Street    
Greenwich Street between Peninsula Boulevard and Baldwin Road
Baldwin Road between Greenwich Street and Elizabeth Avenue
Jerusalem Avenue between Greenwich Street and Uniondale Avenue
Front Street between Clinton Street and Ingraham Boulevard
Villa Court between Front Street and Prospect Place
Ingraham Boulevard between Front Street and Jerusalem Avenue
Holly Avenue between Front Street and Jerusalem Avenue
Cedar Street between Holly Avenue and Uniondale Avenue

In addition, switching equipment will be replaced at Peninsula Boulevard north of Whitson Street, Attorney Street north of Front Street, Holly Avenue south of Front Street and Jerusalem Avenue west of Holly Avenue


North Merrick, North Bellmore, and East Meadow 
The route will cover approximately 3 miles along an electric main line circuit.
Start date: February 2018
Posted date: October 30, 2018

PSEG Long Island crews will be working on the following streets:
Merrick Avenue between Tyler Avenue and Benjamin Avenue
Prospect Avenue between Merrick Avenue and Pine Lane
Bellmore Avenue between Prospect Avenue and North Jerusalem Road
North Jerusalem Road between Bellmore Avenue and Taft Street
Ramona Street between Newbridge Road and Kingston Avenue
Kingston Avenue between Ramona Street and Nira Avenue
Nira Avenue between Kingston Avenue and Bellmore Road
Bellmore Road between Birch Avenue and North Jerusalem Road
Hoover Street between Nira Avenue and Oxford Place

In addition, switching equipment will be replaced at East Meadow Avenue north of North Jerusalem Road, Merrick Avenue south of Tyler Avenue and Newbridge Road north of North Jerusalem Road



Baldwin 
The route will cover approximately 3 miles along an electric main line circuit.
Start date: June 2018

PSEG Long Island crews will be working on the following streets:
Cottage Place between Central Avenue and Milburn Avenue
Milburn Avenue between Cottage Place and Merrick Road
Milburn Avenue between Garden Place and Church Street
Church Street between Milburn Avenue and Grand Boulevard
Grand Boulevard between Church Street and Van Buren Street
Western Boulevard between Verity Lane and Van Buren Street
Verity Lane between Atlantic Avenue and Western Boulevard
Hastings Street between Verity Lane and Milburn Avenue
Van Buren Street between Schreiber Place and Milburn Avenue
Byrd Place between Van Buren Street and Northern Boulevard
Northern Boulevard between Byrd Place and Bertha Drive
Bertha Drive between Northern Boulevard and Cherrywood Drive
Bonnie Drive between Grand Avenue and Schreiber Place
Milburn Avenue between Northern Boulevard and Judith Place
Harbor Point Road between North End Drive and Judith Place   

In addition, switching equipment will be replaced at Church Street west of Milburn Avenue, Cornwell Avenue east of Milburn Avenue, Milburn Avenue south of Northern Boulevard, Van Buren Street west of Milburn Avenue and Van Buren Street west of Grand Boulevard


Village of Valley Stream
The route will cover approximately 1 mile along an electric main line circuit.
Start Date: November 2018

PSEG Long Island crews will be working on the following streets:
Corona Avenue between Blakeman Drive and Lamberson Street
Linden Boulevard between Tudor Gate and Greenway Boulevard
Alden Avenue between Elmont Road and Rottkamp Street
Rottkamp Street between Alden Avenue and Sobro Avenue    

Crews will move the main line wires underground along the following streets:
Greenway Boulevard between Niagara Street and Fletcher Avenue

This will storm-harden the main line circuit while allowing the utility poles and overhead secondary electric wires in rear properties to continue connecting residents to the energy grid.  In addition, switching equipment will be replaced at North Corona Avenue south of Hendrickson Avenue, Hendrickson Avenue east of Henry Street, Fletcher Avenue south of Hendrickson Avenue, Fletcher Avenue between Crowell Place and West Merrick Road, Fletcher Avenue north of Edlu Court and Elmont Road between Linden Boulevard and Southern State Parkway


Franklin Square and Elmont
The route will cover approximately 3 miles along an electric main line circuit.
Start date: June 2018

PSEG Long Island crews will be working on the following streets:
Clement Avenue between Hempstead Turnpike (Route 24) and Theodora Street
Theodora Street between Randolph Avenue and Franklin Avenue
Franklin Avenue between Ferngate Drive and Theodora Street
Randolph Avenue between Theodora Street and Mosefan Street
Rosegold Street between Randolph Avenue and Franklin Avenue
Mosefan Street between Randolph Avenue and Franklin Avenue
Gabriel Avenue between Franklin Avenue and Hoffman Street
Benris Avenue between Franklin Avenue and James Street
Hoffman Street between Gabriel Avenue and Adams Avenue
Adams Avenue between Hoffman Street and dead end
Jackson Avenue between Madison Street and Howard Avenue
Polk Avenue between Madison Street and Franklin Avenue

The main line electric wires will be moved underground to bypass rear properties along the following streets:
Madison Street between Jackson Avenue and Adams Avenue
Penn Road between dead end and Campus Road
Campus Road between Penn Road and Cornell Road
Cornell Road between Campus Road and Dogwood Avenue    

This will storm-harden a main line circuit serving hundreds of customers in the area, while allowing the utility poles and overhead secondary electric wires in these rear properties to continue connecting these residents to the energy grid with minimal disruptions.   In addition, switching equipment will be installed or replaced at Theodora Street west of Clement Avenue, Clement Avenue north of Theodora Street, Theodora Street west of Franklin Avenue, Benris Avenue east of Hoffman Street, Franklin Avenue north of Jackson Avenue and Franklin Avenue north of Ferngate Drive

 


Lido Beach and the City of Long Beach
Start Date: February 2019

Crews will be working on 1 miles of an electric main line circuit on the following streets: 
East Park Avenue between Franklin Boulevard and Maple Boulevard    
East Chester Street between Franklin Boulevard and Roosevelt Boulevard
East Walnut Street between Roosevelt Boulevard and Maple Boulevard      

In addition, switching equipment will be installed or replaced at Roosevelt Boulevard between East Park Avenue and East Chester Street, Maple Boulevard between East Walnut Street and Redan Road and Lido Boulevard between Fairway Road and Blackheath Road


Uniondale and East Meadow
The route will cover approximately 1.5 miles along an electric main line circuit.
Start date: December 2018
Posted date: December 4, 2018  

PSEG Long Island crews will be working on the following streets:  
Uniondale Avenue between Waverly Place and Hempstead Boulevard
Goodrich Street between Uniondale Avenue and Chester Street
Chester Street between Goodrich Street and Front Street (Route 102)
Arcadia Avenue between Front Street (Route 102) and Cambria Street
Cambria Street between Arcadia Avenue and Gilroy Avenue   

In addition, switching equipment will be replaced at Cedar Street west of Uniondale Avenue, Uniondale Avenue south of Front Street (Route 102) and Front Street (Route 102) west of Merrick Avenue


Wantagh, North Bellmore and Bellmore 
The route will cover approximately 4 miles along an electric main line circuit.
Start date: January 2019 
Posted date: December 12, 2018 

PSEG Long Island crews will be working on the following streets:
Oakfield Avenue between North Jerusalem Road and Beltagh Avenue
Jerusalem Avenue between Roger Road and Tulip Lane
Beltagh Avenue between Bellmore Avenue and Roland Avenue
Roland Avenue between Beltagh Avenue and Valentine Place    

In addition, switching equipment will be installed at Beltagh Avenue east of Bellmore Avenue, Roland Avenue north of Valentine Place, Oakfield Avenue south of Ardsley Road and Jerusalem Avenue west of Tulip Lane


Villages of Garden City and Mineola
The route will cover approximately 0.8 miles along an electric main line circuit.
Start date: January 2019
Posted date: December 19, 2018

PSEG Long Island crews will be working on the following streets:  
Willis Avenue between Harrison Avenue and Old Country Road
Old Country Road between Roslyn Road and Clinton Road  
In addition, switching equipment will be installed at Old Country Road west of Linden Street


North Merrick, North Bellmore, and East Meadow
The route will cover approximately 3 miles along an electric main line circuit.

PSEG Long Island crews will be working on the following streets:  
Merrick Avenue between Tyler Avenue and Benjamin Avenue
Prospect Avenue between Merrick Avenue and Pine Lane
Bellmore Avenue between Prospect Avenue and North Jerusalem Road
North Jerusalem Road between Bellmore Avenue and Taft Street
Ramona Street between Newbridge Road and Kingston Avenue
Kingston Avenue between Ramona Street and Nira Avenue
Nira Avenue between Kingston Avenue and Bellmore Road
Bellmore Road between Birch Avenue and North Jerusalem Road
Hoover Street between Nira Avenue and Oxford Place    

In addition, switching equipment will be replaced at East Meadow Avenue north of North Jerusalem Road, Merrick Avenue south of Tyler Avenue and Newbridge Road north of North Jerusalem Road


Wantagh, Levittown, and East Meadow
The route will cover approximately 2 miles along an electric main line circuit.
Start date January 2019
Posted date: January 11, 2019

PSEG Long Island crews will be working on the following streets:
North Jerusalem Road between Bellmore Road and Old Jerusalem
Old Jerusalem Road between North Jerusalem Road and Wantagh Avenue    
Gardiners Avenue between Knoll Lane and North Jerusalem Road/Old Jerusalem Road      

In addition, switching equipment will be replaced at Old Jerusalem Road west of Wantagh Avenue, Gardiners Avenue north of Silo Lane and Gardiners Avenue north of Knoll Lane


Oceanside and the Village of East Rockaway 
The route will cover approximately 4 miles along an electric main line circuit.
Start date February 2019
Posted date: January 11, 2019

PSEG Long Island crews will be working on the following streets: 
Main Street between Leonard Drive and Atlantic Avenue
Waldo Avenue between Main Street and Maxwell Street
Maxwell Street between Waldo Avenue and Atlantic Avenue
Atlantic Avenue between Main Street and Woods Avenue
Phipps Avenue between Atlantic Avenue and Davison Plaza
Davison Plaza between Phipps Avenue and Ocean Avenue
Ocean Avenue between Atlantic Avenue and Mill River Avenue
Pearl Street between Ocean Avenue and Evergreen Avenue
Evergreen Avenue between Pearl Street and Atlantic Avenue
Atlantic Avenue between Rockaway Avenue and Clark Avenue
Waverly Avenue between Atlantic Avenue and Riverside Avenue
Riverside Avenue between Waverly Avenue and Lawson Boulevard
Lawson Boulevard between Atlantic Avenue and Bayside Avenue
Vermont Avenue between Lawson Boulevard and Fulton Avenue
Messick Avenue between Vermont Avenue and West Windsor Parkway
Moore Avenue between Messick Avenue and Lawrence Avenue   

In addition, switching equipment will be replaced at Lawson Boulevard north of Daly Boulevard, Lawson Boulevard north of Vermont Avenue, Vermont Avenue west of Fulton Avenue and Atlantic Avenue south of Woods Avenue  


 
Villages of Lynbrook and Valley Stream 
The route will cover approximately 2.3 miles along an electric main line circuit.
Start date: February 2019
Posted date: January 28, 2019

PSEG Long Island crews will be working on the following streets:
West Valley Stream Boulevard between South Central Avenue and Rockaway Avenue
South Franklin Avenue between West Fairview Avenue and West Valley Stream Boulevard
Rockaway Avenue between East Merrick Road and Sunrise Highway (Route 27)
East Mineola Avenue between Rockaway Avenue and South Cottage Street
South Cottage Street between East Mineola Avenue and East Lincoln Avenue
East Lincoln Avenue between South Cottage Street and Addison Place    
Whitehall Street between Hendrickson Avenue and Grand Avenue
Grand Avenue between Whitehall Street and Hendrickson Avenue
Hendrickson Avenue between Dawes Avenue and South Franklin Avenue
Stevenson Street between Hendrickson Avenue and Highland Boulevard    

In addition, switching equipment will be replaced at Mill Road south of Sunrise Highway (Route 27), Rockaway Avenue south of East Merrick Road and Stevenson Street south of Highland Boulevard


 
Hewlett and the Villages of Lynbrook and East Rockaway 
The route will cover approximately 3.3 miles along an electric main line circuit.
Start date: February 28, 2019 
Posted date: January 28, 2019

PSEG Long Island crews will be working on the following streets:
Whitehall Street between Grand Avenue and Hendrickson Avenue
Horton Avenue between Hendrickson Avenue and East Hawthorne Avenue
Bixley Heath between Scranton Avenue and Northumberland Gate
Northumberland Gate between Bixley Heath and Peninsula Boulevard
Farnum Street between Peninsula Boulevard and Broadway
Hollywood Avenue between Prospect Avenue and Farnum Street
Scranton Avenue between Broadway and Atlantic Avenue
Union Avenue between Peterson Place and Prospect Avenue
Rowe Avenue between Union Avenue and Waverly Avenue    
Waverly Avenue between Rowe Avenue and Scranton Avenue
Bowler Road between Waverly Avenue and Newkirk Avenue
Newkirk Avenue between Bowler Road and Howland Road
Howland Road between Newkirk Avenue and Main Street    

In addition, switching equipment will be installed or replaced at Scranton Avenue west of High Street, Scranton Avenue east of Freer Street and Hollywood Avenue north of Prospect Avenue


 
Oceanside 
The route will cover approximately 3.5 miles along an electric main line circuit.
Start date: March 2019
Posted date: February 11, 2019

PSEG Long Island crews will be working on the following streets:  
Royal Avenue between Riverside Drive and Anchor Avenue    
Anchor Avenue between Royal Avenue and Messick Avenue    
Messick Avenue between Anchor Avenue and Perkings Avenue    
West Windsor Pkwy between Messick Avenue and Nassau Road    
Nassau Road between Atlantic Avenue and Weidner Avenue    
Atlantic Avenue between Bayview Avenue and Lincoln Avenue    
Terrell Avenue between Atlantic Avenue and Silver Lane 
Silver Lane between Terrell Avenue and Rockaway Avenue    
Rockaway Avenue between Pearl Street and Windsor Place    
Windsor Place between Rockaway Avenue and Chester Street    
Chester Street between Windsor Place and Woods Avenue    
Woods Avenue between Chester Street and Lincoln Avenue    

In addition, switching equipment will be replaced at Royal Avenue south of Weidner Avenue, Atlantic Avenue east of Waverly Avenue, Terrell Avenue north of Atlantic Avenue and Woods Avenue west of Lincoln Avenue


 
Oceanside
The route will cover approximately 3 miles along an electric main line circuit.
Start date: February 2019
Posted date: February 20, 2019

PSEG Long Island crews will be working on the following streets:
Daly Boulevard between Long Beach Road and Lawson Boulevard    
Lawrence Avenue between Concord Avenue and Harris Drive    
Concord Avenue between Lawrence Avenue and Fulton Avenue    
Fulton Avenue between Concord Avenue and Montgomery Avenue    
Montgomery Avenue between Fulton Avenue and Long Beach Road    
Long Beach Road between West Cortland Avenue and Fairview Avenue    
Bellevue Avenue between Long Beach Road and Oceanside Road    
Trinity Street between Windsor Parkway and Bellevue Avenue    
Roxbury Road between Windsor Parkway and Bellevue Avenue    

In addition, switching equipment will be installed at Long Beach Road north of West Cortland Avenue, Lincoln Avenue north of Atlantic Avenue and Davison Avenue east of Oceanside Road



Franklin Square and the Villages of Garden City and Stewart Manor
 
The route will cover approximately 2.5 miles along an electric main line circuit.
Start date: March 2019
Posted date: March14, 2019

PSEG Long Island crews will be working on the following streets:
Whiteside Avenue between Averill Boulevard and Barrymore Boulevard    
Barrymore Boulevard between Hempstead Turnpike (Route 24) and Tulip Avenue    
Tulip Avenue between Farnum Boulevard and New Hyde Park Road    
New Hyde Park Road between Plaza Road and Washington Street    
Washington Street between New Hyde Park Road and Goldenrod Avenue    
Court House Road between Roosevelt Street and Garden City Road    

In addition, switching equipment will be installed or replaced at Tulip Avenue west of Barrymore Boulevard, Washington Street west of Court House Road and New Hyde Park Road north of Benmore Avenue



West Hempstead, Valley Stream North, the Village of Malverne, and Franklin Square

The route will cover approximately 4.7 miles along an electric main line circuit.
Start date: March 2019
Posted date: March 22, 2019  

PSEG Long Island crews will be working on the following streets:
Franklin Avenue between Scott Drive and Slabey Avenue    
Wright Street between Franklin Avenue and Ambrose Avenue    
Ambrose Avenue between Wright Street and Cornwell Avenue    
Cornwell Avenue between Franklin Avenue and Dogwood Avenue    
Dogwood Avenue between Atlas Avenue and Semton Boulevard    
Semton Boulevard between Dogwood Avenue and Fenworth Boulevard    
Fenworth Boulevard between James Street and Dogwood Avenue    
James Street between Fenworth Boulevard and Benris Avenue    
Benris Avenue between James Street and Hoffman Street    
Nassau Boulevard between Hempstead Turnpike (Route 24) and Baldwin Drive    
Roosevelt Boulevard between Nassau Boulevard and Hempstead Avenue    

In addition, switching equipment will be replaced at Franklin Avenue west of Cornwell Avenue, Nassau Boulevard south of Hempstead Turnpike and Roosevelt Boulevard at intersection of Hempstead Avenue


 
Franklin Square, North Valley Stream and West Hempstead 
The route will cover approximately 2 miles along an electric main line circuit.
Start date: March 2019
Posted date: March 26, 2019

PSEG Long Island crews will be working on the following streets: 
Franklin Avenue between Linden Street and Gavrin Boulevard   
Corona Avenue between Dutch Broadway and Franklin Avenue   
Ferngate Drive between Franklin Avenue and Lorraine Drive   
Hawthorne Street between Euclid Avenue and Nassau Boulevard   
Nassau Boulevard between Hawthorne Street and Roosevelt Boulevard   
Johnson Lane between Nassau Boulevard and Hempstead Avenue   
Hempstead Avenue between Walker Place and Oakford Street      

In addition, switching equipment will be installed or replaced at Hawthorne Street east of Howard Avenue, Hempstead Avenue north of Johnson Lane, Nassau Boulevard between Pauley Drive and Baldwin Drive and Corona Avenue north of Dutch Broadway



Elmont 
The route will cover approximately 1.2 miles along an electric main line circuit.
Start date: March 26, 2019
Posted date:  March 26, 2019

PSEG Long Island crews will be working on the following streets:
Atherton Avenue between Lincoln Street and Stewart Street    
Stewart Street between Atherton Avenue and Kiefer Avenue    
Kiefer Avenue between Stewart Street and Lehrer Avenue    
Lehrer Avenue between Kiefer Avenue and Hempstead Turnpike (Route 24)    
Sweetman Avenue between Lehrer Avenue and Meacham Avenue   

In addition, switching equipment will be installed or replaced at Lehrer Avenue south of Hempstead Turnpike, Sweetman Avenue west of Meacham Avenue and Theodora Street west of Clement Avenue



Franklin Square and Elmont

The route will cover approximately 3 miles along an electric main line circuit.
Start date: April 2019
Posted date: April 8, 2019

PSEG Long Island crews will be working on the following streets:
Clement Avenue between Hempstead Turnpike (Route 24) and Theodora Street
Theodora Street between Randolph Avenue and Franklin Avenue
Franklin Avenue between Ferngate Drive and Theodora Street
Randolph Avenue between Theodora Street and Mosefan Street
Rosegold Street between Randolph Avenue and Franklin Avenue
Mosefan Street between Randolph Avenue and Franklin Avenue
Gabriel Avenue between Franklin Avenue and Hoffman Street
Benris Avenue between Franklin Avenue and James Street
Hoffman Street between Gabriel Avenue and Adams Avenue
Adams Avenue between Hoffman Street and dead end
Jackson Avenue between Madison Street and Howard Avenue
Polk Avenue between Madison Street and Franklin Avenue

In addition, switching equipment will be installed or replaced at Theodora Street west of Clement Avenue, Clement Avenue north of Theodora Street, Theodora Street west of Franklin Avenue, Benris Avenue east of Hoffman Street, Franklin Avenue north of Jackson Avenue and Franklin Avenue north of Ferngate Drive


 
Elmont and North Valley Stream
The route will cover approximately 3 miles along an electric main line circuit.
Start date: April 2019
Posted date: April 10, 2019

PSEG Long Island crews will be working on the following streets:
Makofske Avenue/Frederick Avenue between Chelsea Street and Marguerite Avenue
Makofske Avenue between Marguerite Avenue and Hempstead Turnpike (Route 24)
Hempstead Turnpike (Route 24) between Makofske Avenue and Rockmart Avenue
Rockmart Avenue between Hempstead Turnpike (Route 24) and Atherton Avenue
Hillsboro Avenue between Hempstead Turnpike (Route 24) and Atherton Avenue
Atherton Avenue between Hillsboro Avenue and Crowell Street
Crowell Street between Atherton Avenue and Chowan Street
Chowan Street between Crowell Street and Elmont Road
Elmont Road between Chowan Street and Baylis Avenue
Belmont Avenue between Elmont Road and 3rdStreet
3rd Street between Belmont Avenue and Ludlam Avenue
Ludlam Avenue between 3rd Street and 5th Street
Baylis Avenue between Elmont Road and Rye Street
238th Street between Dutch Broadway and 115th Road
115th Road between 238th Street and 237th Street
237th Street between 115th Road and Linden Boulevard
Linden Boulevard between 237th Street and Elmont Road

In addition, switching equipment will be installed or replaced at Meacham Avenue south of Hempstead Turnpike (Route 24), Hempstead Turnpike (Route 24) east of Clement Avenue and Elmont Road north of Belmont Avenue

 



North Valley Stream and the Village of Valley Stream
The route will cover approximately 1 mile along an electric main line circuit.
Start date: April 2019
Posted date: April 18, 2019

PSEG Long Island crews will be working on the following streets:
Corona Avenue between Blakeman Drive and Lamberson Street
Linden Boulevard between Tudor Gate and Greenway Boulevard
Alden Avenue between Elmont Road and Rottkamp Street
Rottkamp Street between Alden Avenue and Sobro Avenue
In addition, switching equipment will be replaced at North Corona Avenue south of Hendrickson Avenue, Hendrickson Avenue east of Henry Street, Fletcher Avenue south of Hendrickson Avenue, Fletcher Avenue between Crowell Place and West Merrick Road, Fletcher Avenue north of Edlu Court and Elmont Road between Linden Boulevard and Southern State Parkway

 


North Valley Stream and Elmont 
The route will cover approximately 1 mile along an electric main line circuit.
Start date: June 2019
Posted date: May 29, 2015

PSEG Long Island crews will be working on the following streets: 
Dutch Broadway between Elmont Road and Fletcher Avenue
Fletcher Avenue between Dutch Broadway and Bowe Road
Corona Avenue between Dutch Broadway and Midvale Lane 
In addition, switching equipment will be installed at Elmont Road north of Cromer Road West and Fletcher Avenue north of Edlu Court


Completed Projects

Affected Route One- Villages of Lawrence and Cedarhurst
Peninsula Boulevard between Edward Avenue and Oakland Avenue
Branch Boulevard between Redwood Drive and Peninsula Boulevard
Church Avenue between Peninsula Boulevard and West Broadway
Prospect Avenue between West Broadway and Chestnut Street
Chestnut Street between Prospect Avenue and Linwood Avenue
Cedarhurst Avenue between Willow Avenue and Broadway
Broadway between Auerbach Lane and Weyant Drive

Affected Route Two- Villages of Lawrence and Cedarhurst
Peninsula Boulevard between Edward Avenue and Oakland Avenue
Oakland Avenue between Hemlock Drive and Peninsula Boulevard
Peninsula Boulevard between Branch Boulevard and Albemarle Road
West Broadway between Linwood Avenue and Roselle Avenue
Cedarhurst Avenue between West Broadway and Fifth Avenue
Fifth Avenue between Cedarhurst Avenue and Washington Avenue
Washington Avenue between Fifth Avenue and Pearsall Avenue
Lawrence Avenue between Pearl Street and Mott Avenue
Mott Avenue between Lawrence Avenue and John Street
Rockaway Turnpike between Central Avenue and Broadway
Meadow Lane between Broadway and Causeway Road
Kenridge Road between Meadow Lane and Washington Avenue South
Washington Avenue South between Broadway and Bayberry Road

Affected Route Four - Far Rockaway, Queens and Village of Atlantic Beach
Bay 24th Street and Mott Avenue
Reads Lane between Empire Avenue and Hicksville Road
Hicksville Road between Reads Lane and Beach 9th Street
Beach 9th Street between Meehan Avenue and Cornaga Avenue
Lanett Avenue between Beach 9th Street and Beach 12th Street
Caffrey Avenue between Beach 9th Street and Hurley Court
Mott Avenue between Cornaga Avenue and Frisco Avenue
Frisco Avenue between Beach 12th Street and Beach 13th Street
Beach 12th Street between Frisco Avenue and Plainview Avenue
Plainview Avenue between Beach 12th Street and Beach 13th Street
Granada Lane north of Bay Boulevard
Bay Boulevard between Granada Lane and Daytona Street
Daytona Street between Bay Boulevard and Atlantic Boulevard

Affected Route Five
Gardiners Avenue between Halter Lane and Hempstead Turnpike (Route 24)
Hempstead Turnpike (Route 24) between Ranch Lane and Shelter Lane
Division Avenue between Hempstead Turnpike (Route 24) and Schoolhouse Road

Affected Route Six
Smith Street between Babylon Turnpike and Merrick Avenue
Babylon Turnpike between Meadowbrook Road and Merrick Road
Lippold Street between Babylon Turnpike and Dobson Avenue
Dobson Avenue between Lippold Street and Merrick Road
Merrick Road between Dobson Avenue and Chernucha Avenue

Affected Route Seven - Towns of Hempstead and Oyster Bay
Seamans Neck Road between Twisting Lane and Jerusalem Ave
Pineneck Road between Berrywood Drive and Flowerdale Drive
Flowerdale Drive between Pineneck Road and Arlington Drive
Rear property on the west side of Arlington Drive between Flowerdale Drive and Duff Place
Rear property on the north side of Duff Place between Arlington Drive and 4129 Duff Place
Rear property on the south side of Duff Place between 4130 Duff Place and Hicksville RoadRear Property on the south side of Peter Street between Seamans Neck Road and Pineneck Road

Affected Route Eight
Wantagh Avenue between Duckpond Drive North and Hunt Road
Seamans Neck Road between Peter Street and Parker Avenue

Affected Route Nine

  • Wantagh Avenue between Bayport Court and Canal Place
  • Bayport Court between Wantagh Avenue and Bayview Avenue
  • Bayview Avenue between Bayport Court and Oakdale Court
  • Oakdale Court between Bayview Avenue and Freeport Street
  • Freeport Street between Oakdale Court and Bellport Avenue
  • Bellport Avenue between Freeport Street and Beverly Road

 
Affected Route Ten - Town of Hempstead and Village of Valley Stream

  • Gabirol Street between Oakland Ave and Branch Boulevard
  • Branch Boulevard between Halevy Drive and Hungry Harbor Road
  • Stevenson Street between Branch Boulevard and Barnard Avenue
  • Hungry Harbor Road between Cliffside Avenue and Brookfield Road
  • Hewlett Drive between Whitehall Drive and Rosedale Road

 
Affected Route Eleven - Village of Hempstead

  • Attorney Street between Front Street and Peninsula Boulevard
  • Peninsula Boulevard between Attorney Street and Fulton Avenue
  • Fulton Avenue between Peninsula Boulevard and Robson Place
  • Bennett Avenue between Fulton Ave and Harvard Street
  • Jackson Street between Bennett Ave and Robson Place
  • Harvard Street between Westbury Boulevard and Bennett Avenue
  • Dartmouth Street between Bennett Avenue and Remsen Avenue
  • Remsen Avenue between Wellington Street and Dartmouth Street
  • Cornell Street between Remsen Avenue and Boylston Street
  • Boylston Street between Meadow Street and Westbury Boulevard
  • Pilot Street between Boylston Street and Westbury Boulevard
  • Westbury Boulevard between Boylston Street and Harvard Street
  • Warner Avenue between Harvard Street and Fulton Avenue
  • Fulton Avenue between Warner Avenue and Truro Ln
  • Hendrickson Avenue between Fulton Avenue and Front Street
  • Front Street between Ingraham Boulevard and Uniondale Avenue
  • Holly Avenue between Front Street and Crowell Street
  • Duncan Road between Butler Place and Front Street
  • Butler Place between Duncan Road and Courtenay Road
  • Courtenay Road between Butler Place and Primrose Lane
  • California Avenue between Huntington Place and Front Street

 
Affected Route Twelve

  • Hempstead Turnpike (Route 24) between Gardiners Avenue and Emerson Avenue
  • Wantagh Avenue between Hempstead Turnpike (Route 24) and Stony Lane
  • Gardiners Avenue between Hill Lane and Homestead Lane
  • Wantagh Avenue from approximately 80 feet south of Sunrise Lane to Sunrise Lane
  • Sunrise Lane between Wantagh Avenue and Green Lane
  • Green Lane between Sunrise Lane and Copper Lane
  • Copper Lane between Green Lane and Halter Lane
  • Halter Lane between Copper Lane and Gardiners Avenue
  • Gardiners Avenue from approximately 50 feet north of Halter Lane to Halter Lane

 
Affected Route Thirteen

  • Howard Place between South Long Beach Road and Oceanside Road
  • Oceanside Road between Oswald Court and Clovermere Road
  • Nassau Parkway between Oceanside Road and Loftus Avenue
  • Loftus Avenue between Nassau Parkway and Foxhurst Road
  • Oswald Court between Mount Avenue and Washington Avenue
  • Washington Avenue between Oswald Court and Merrick Road
  • Merrick Road between Washington Avenue and Lakeside Drive
  • Gale Avenue between Merrick Road and Prospect Street
  • Prospect Street between Gale Avenue and Grand Avenue
  • Grand Avenue between Merrick Road and Sunrise Highway (Route 27)
  • Sunrise Highway (Route 27) between Grand Avenue and Central Avenue
  • Harrison Avenue between Sunrise Highway (Route 27) and Bixby Drive

 
Affected Route Fourteen - Valley Stream

  • Dubois Avenue between Amherst Road and Rockaway Avenue
  • Rockaway Avenue between Dubois Avenue and Catherine Street
  • Catherine Street between Rockaway Avenue and Forest Avenue
  • Forest Avenue between Catherine Street and Brooklyn Avenue
  • Brooklyn Avenue between Brookside Drive and Forest Avenue
  • East Hawthorne Avenue between Rockaway Avenue and Newbold Avenue
  • Satterie Avenue between Sunrise Highway (Route 27) and East Mineola Avenue
  • East Mineola Avenue between South Cottage Street and Horton Avenue
  • Rockaway Avenue north of 4th Street

 
Affected Route Fifteen - Merrick, North Merrick, and Bellmore

  • Smith Street between Grand Avenue and Brooklyn Avenue
  • Grand Avenue between Smith Street and Newbridge Road
  • Merrick Avenue North between Smith Street and Camp Avenue
  • Camp Avenue between Merrick Avenue North and Meadowbrook Road
  • Horatio Avenue between Merrick Avenue North and State Street
  • State Street between Horatio Avenue and Bushwick Avenue
  • Bushwick Avenue between State Street and Meadowbrook Road
  • Smith Street west of Merrick Avenue North
  • Bushwick Avenue east of Meadowbrook Road
  • Merrick Avenue North south of Camp Avenue
  • Merrick Avenue north of Camp Avenue

 
Affected Route Sixteen - Salisbury and East Meadow

  • Carman Avenue between Dofena Lane and Bob Reed Lane
  • Salisbury Park Drive between Bob Reed Lane and Old Westbury Road
  • Bob Reed Lane between Salisbury Park Dr and Carman Ave
  • Stewart Avenue between Carman Avenue and Plumtree Road W
  • Bowling Green Dr between Stewart Avenue and Old Country Road
  • Old Country Road between Elton Street and Belmont Place

 
Crews will move the main line wires underground along the following streets:

  • Carman Avenue between Bob Reed Lane and Melody Lane
  • Melody Lane between Carman Avenue and Lion Lane
  • Lion Lane between Melody Lane and Land Lane
  • Land Lane between Lion Lane and Level Lane
  • Level Lane between Land Lane and Stewart Ave
  • Stewart Avenue between Level Lane and Grand Boulevard


Affected Route Eighteen - Seaford and Massapequa | Towns of Hempstead and Oyster Bay

  • Sunrise Highway (Route 27) between Seaford Avenue and Hicksville Road (Route 107)
  • Seaford Avenue between Sunrise Highway and Pennsylvania Avenue
  • Seaford Avenue between Sunrise Highway (Route 27) and Merrick Road
  • Waverly Avenue between Seaford Avenue and Seamans Neck Road
  • Seamans Neck Road between Waverly Avenue and Merrick Road

 
In addition, switching equipment will be replaced at Sunrise Highway east of Oakland Avenue, Sunrise Highway west of Hicksville Road (Route 107), Seaford Avenue west of Spur Lane.


Lido Beach
Start date: October 2017

PSEG Long Island crews will be working on the following streets:
Lido Boulevard between Blackheath Road and Fairway Road

In addition, switching equipment will be replaced at: Lido Boulevard at the northwest corner of Blackheath Road.

Villages of Garden City and Mineola
Start date: February 2018

Crews will be working on 0.8 miles of an electric main line circuit on the following streets:
Willis Avenue between Harrison Avenue and Old Country Road
Roslyn Road between Hinck Way and Old Country Road
Old Country Road between Rioslyn Road and Clinton Road

Crews will move the main line wires underground along the following streets:
Seabury Road between Old Country Road and Surrey Lane
Surrey Lane between Seabury Road and Avalon Road
Avalon Road between Surrey Lane and Clinton Road

This will storm-harden the main line circuit while allowing the utility poles and overhead secondary electric wires in rear properties to continue connecting residents to the energy grid. In addition, switching equipment will be installed at Old Country Road west of Linden Street


Levittown
Start Date: April 2018

The main line electric wires will be moved underground along the following streets:
Dogwood Lane between Newbridge Road (Route 106) and Old Farm Road
Old Farm Road between Dogwood Lane and Strawberry Lane
Strawberry Lane between Old Farm Road and Cornflower Road
Division Avenue between Old Farm Road and Schoolhouse Road
Schoolhouse Road between Division Avenue and Valley Road
Valley Road between Schoolhouse Road and Hilltop Road
Church Road between Division Avenue and Valley Road
Valley Road between Church Road and Cherry Tree Lane
This will storm-harden a main line circuit serving hundreds of customers in the area, while allowing the utility poles and overhead secondary electric wires to continue connecting residents to the energy grid with minimal disruptions.

Village of Valley Stream
Hunter Avenue between Copiague Street and Sobro Avenue
Copiague Street between Hunter Avenue and Lyon Street
Ethel Street between Lyon Street and Shaw Avenue
Arlington Avenue between Copiague Street and West Merrick Road
Broadway between Harvard Street and Fir Street
Fir Street between Broadway and Boden Avenue
Borden Avenue between Fir Street and West Valley Stream Boulevard
West Valley Stream Boulevard between Boden Avenue and South Central Avenue
South Terrace Place between LIRR tracks and Buscher Avenue

Town of Hempstead and Village of Valley Stream
Gabirol Street between Oakland Ave and Branch Boulevard
Branch Boulevard between Halevy Drive and Hungry Harbor Road
Stevenson Street between Branch Boulevard and Barnard Avenue
Hungry Harbor Road between Cliffside Avenue and Brookfield Road
Hewlett Drive between Whitehall Drive and Rosedale Road